Monday, October 31, 2011

Finishing Touches

The finish line is almost here at 100 Yorktown.  The home building blog was put on the back burner as we spent the last couple of months finding light fixtures, selling a house and taking on more work responsibilities.  Carpet installation was started today and will be completed tomorrow.

Latest photos are posted below and have a peering in the windows look as I took them after they put the finish coat on the floors and they were still wet.

Add caption

View into Great Room from Mud Room

View of Wet Floors

Great Room and Dining Room

View into Kitchen


Foyer

Wednesday, August 10, 2011

Master Bath Tile


August 10, 2011 - Master Bathroom Tile





The tile was laid in the master bathroom today. It looks awesome. Thanks to Southgate Residential for helping with tile design. The remainder of the shower will be laid tomorrow.
Posted by Picasa

Saturday, May 28, 2011

The Open Floor Plan - Seeing the forest through the trees

Even though this home construction is our first rodeo, we have quickly learned that home building for the owner is a string of decisions that link together like a chain of events.  It reminds me in a way of those "Choose Your Own Adventure" books I used to read as a kid.  Initial decisions set the wheels in motion on a progression of other decisions.  Sometimes it is easy to forget, that it is just as important to have in mind the beauty of the forest when we are among the trees.

Case in point, during his site visit, Brandon from Southgate Residential subtlety reminded me of the importance of remembering to keep in mind the open floor plan of the Frank Betz Appleton Chase as we work through individual choices and selection of interior finishes.  The following photos, while still in the framing stage show how the sightlines or vantage points from various parts of the house in this floor plan will show features of several different rooms within the same scene.  This is why choices in individual rooms have to be always placed in the context of the overall house.  See the photos below.

Vantage Point from the Foyer
The photo in the foyer shows a vantage point looking directly into the dining room in the photo foreground.  The open floor plan when finished also will showcase the decorative stairwell and even provide a background glimpse through line of sight into the kitchen furnishings and corner windows.


















Vantage Point from Grand Room into Kitchen Area
This view from the grand room entry will provide a view into the kitchen furnishings even a view out onto the golf course through the keeping room.

Monday, May 23, 2011

Construction - Week 10 Day 50 and 51, May 19-20, 2011

50 Days In 


View of rear of house with sheathing board - Photo taken Saturday, May 21, 2011




Day 50 came and went.  The roofers continued with the shingles.  The framers moved to sheathing the back of the house.  On Friday, it appears they had a short day after a long week on the top of 100 Yorktown.

The most exciting thing about Day 51 was Brandon Smith with Southgate Residential came to town.  We were able to walk him through the house and share our vision for our home with him.  We then made what was to be a quick trip to Lowes.  About 2.5 hours later, we left Lowes with a complete kitchen redesign and a bunch of our initial decisions made.

Saturday, May 21, 2011

Construction - Week 10 Day 49 - May 18, 2011

@ 100 Yorktown Construction Continued on sheathing and shingling the roof.

We also met with Doug Lilly at Lowes to discuss our plumbing fixtures.  Karen was very excited to see the faucets, tubs, and toilets that Doug typically uses.  We think we know what our selections will be we just want to confirm with Brandon of Southgate Residential prior to finalization.  More on those selections later.

Here are today's photos:

Sheathing over top of the rear porch and master suite

Closeup of Shingles 


Sheathing on the Vaulted Ceiling of the Grand Room



Saturday, May 14, 2011

Week 9, Days 45-46, May 12 and 13, 2011

The Roof Sheathing begins and here come the decisions


I received an early phone call from Doug on Thursday, May 12 after playing phone tag for two days.   After we went through each other's list, I regret not talking earlier in the week.  The lull in house making decisions is coming to an end and it sounds like the next few weeks will be busy.

Next week we will be doing our electrical and plumbing walk through for rough ins.  We also need to finalize decisions on the mechanical systems.  With the plumbing decision, we have to pick out our tub colors and shower hardware and sink faucets.  We will meet next week at Lowe's to do some of that.  Dad will come up as planned over the weekend to help us start thinking of where to put receptacles, switches, etc.

We are excited Brandon from Southgate Residential will be coming up next weekend to meet with us next weekend and start the process of our interior design.  Brandon is an old friend from high school and has brought lots of good ideas to the table.